This publication provides guidance for the Appointed Person on completing a lift plan for a contract lift. The publication is divided into four parts and contains guidance for safe planning and three template forms that can be completed by the AP which indicates the factors that need to be taken into account during the planning process. The forms include a sample risk assessment and method statement, a sample site plan form that shows the positioning of the crane and loads, and a sample form showing the crane access and capacity record for a crane hire. This document is in support of the publication CIG 9801(5).

File Size: 299 KB
Categories: Crane Interest Group, Health and Safety
Downloads: 113