The Crane Interest Group was the original interest group and the largest of all the SIGs, commanding respect both in the UK and in Europe. Members of CIG were heavily involved in the writing of the British Standard 7121 series – Safe Use of Cranes and have also been continually involved in all of the many revisions which have subsequently taken place.
CIG further helped produce CPA Contract Lifting Services Conditions to be used both for Contract Lifts and machine moving operations and helped produce the Supplementary Conditions for crane hire to use in conjunction with the CPA Model Conditions for the Hiring of Plant.
CIG were further heavily involved in the drafting of revisions to the STGO regulations with the Department for Transport, enabling mobile cranes to travel with higher axle loadings and at more realistic road speeds, and continually introduce new and updated versions of their series of safety publications and technical information notices, giving guidance both to the crane rental companies and their customers.
CIG has a steering group and holds an annual open meeting for industry and is currently Chaired by Peter Gibbs from Ainscough Crane Hire Ltd, who continues to undertake dialogue with CIG members to ascertain group priorities and objectives.
Crane Interest Group
ESTA
The Crane Interest Group through the CPA are members of ESTA, the leading European association for the abnormal road transport and mobile crane rental industry and represents national trade associations whose members are mobile crane and access platform, rental and abnormal road transport companies. ESTA are member of the International Crane Stakeholders Assembly [ICSA] from across many countries including Australia, Japan, North America and Canada.
ETSA is further represented on various crane and heavy transport working groups inc. FEM and CEN e.g. EN13000. ESTA also has a library of publications and can be accessed at: https://estaeurope.eu/library/.
More information on ESTA can be found at https://estaeurope.eu/
ESTA has also introduced a European Crane Operator Licence (ECOL) which had much input from CPA Technical Staff. It was introduced in 2019 to overcome the issue of each European member state having its own rules for the professional competence and certification of crane operators. These rules ranged from compulsory to optional and even to no rules at all. The differences can lead to confusion, have a negative impact on safety and also prevent the mobility of crane operators throughout Europe. For this reason, ESTA developed the ECOL programme of training, assessment and certification system for the optimum distribution of safe and qualified mobile crane operators within Europe.
More information on ECOL can be found at: https://ecol-esta.eu/
Crane Interest Group
CAA Airfield Crane Notification System
The Civil Aviation Authority (CAA), the aviation regulator, has introduced a new notification system to help the construction industry in notifying airspace users of cranes above a specified height. Their Airspace Co-ordination Obstacle Management Service (ACOMS) portal will help those planning flights and drone activity to assess any risks and plan appropriately. In essence, notification is required if a crane is:
- to be used within 6 Km of the aerodrome/airfield and its height exceeds 10 metres Above Ground Level (AGL) or that of surrounding structures or trees, if higher, or;
- is to be operated at or above a height of 100 metres AGL regardless of location or height of surrounding structures.
The CAA recommends using ACOMS at least eight weeks before the erection of the crane, however, as the CAA recognises that there are times when very little notice is given to the crane user, additional notification timescales have been created as follows:
PLANNED LONG-TERM PROJECTS: Notification to be sent to the CAA at least eight weeks (40 working days) before the erection of the crane. The CAA will then identify parties that may be affected by the crane and inform the crane user and affected parties about the next steps.
AD-HOC PROJECTS: Notification to be sent to the CAA not later than 5 working days in advance. The CAA will then identify parties that may be affected by the crane and inform the crane user and the affected parties about the next steps.
UNFORESEEN AND URGENT PROJECTS: If there is an unforeseen and urgent requirement to erect a crane within 5 working days from the notification, the crane user is required to contact all aerodromes whose perimeters are within 10 Nautical Miles (NM) (18.5 km) of the crane and submit the notification via ACOMS as soon as possible and advise which aerodrome operators have been contacted and the reason for less than 5 working days’ notice.
Where cranes are to be in situ for more than 90 days, before the crane is erected, users must also notify:
- the CAA by the ACOMS Service, and;
- the Defence Geographic Centre (DGC)
The lighting requirements are the same as previous CPA communications, being:
- Above 150 metres – must be illuminated with 2000 candela;
- Within 6 Km of aerodrome as dictated by aerodrome operator;
- 45 metres to 150 metres – recommend 2000 candela;
- Less than 45m – recommend 32 candela.
If the crane is within the vicinity of an aerodrome AND 100m or higher above ground level, users need to notify both the aerodrome and the CAA via ACOMS. If the crane is in the vicinity of an aerodrome AND 100m or higher above ground level AND in situ for more than 90 days, you need to notify the aerodrome, the CAA and the DGC, as described above.
It is the hirer of the crane (principal or other contractor) who is ultimately responsible for notifying relevant aerodromes and the lighting of the crane. Crane suppliers should ensure that hirers are aware of this requirement.
The CAP 1096 publication – Guidance to Crane Users is in the process of being revised and CAA advise that at least three-months notice will be provided prior to the full implementation of CAP 1096. More information on ACOMs and other notification requirements and how to register to submit notifications is at: https://www.caa.co.uk/commercial-industry/airspace/event-and-obstacle-notification/crane-notification/
Crane Interest Group
Document Library.
| Image | Title | Summary | Categories | Link | hf:doc_categories | hf:doc_tags | hf:file_type |
|---|---|---|---|---|---|---|---|
| CPA CIG 2308 Rev 1 Guidance Supply Management Mobile Cranes May 2026 | This publication, first released in mid-2023 by the CPA’s Crane interest Group (CIG), provided a focus on the minimum standards required for the supply, management and operations of mobile cranes and provided a range of good practice advice on the expected standard of duties and the relevant responsibilities for both operators and crane users. The guide further covers relevant legal requirements and aimed to raise standards and encourage sourcing from responsible mobile crane suppliers. CIG has recently revised the publication to reflect changing circumstances with mobile crane procurement, with the changes including enhancements on: Suppliers and users as what is expected of each party, including responsibilities under the contract and insurance; Competence checks and what to look for; Explanations of legal duties of employers and what information should be passed to the supplier by a user prior to a contract lift; Guidance on hybrid lifting operations and issues this can … | Crane Interest Group, Mobile and Crawler Crane Guidance | crane-interest-group mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CPA CIG_TCIG 2503 Requirements for Lifting Equipment Adjacent to Railways Controlled by Network Rail | This guidance provides clarity about oversailing of Network Rail (NR) infrastructures by all types of crane due to the inherent risks to NR operations, personnel, the travelling public etc and the requirements that must be taken. Where lifting operations are being taken near to NR infrastructure, a series of requirements in a hierarchy needs to be followed, including notification requirements to NR. This document was updated in late 2025 in conjunction with NR. | Crane Interest Group, Tower Crane Interest Group | crane-interest-group tower-crane-interest-group special-interest-groups | ||||
| CPA CIG_TCIG TIN 110 Planning Control of Lifting Operations in Wind V1 July 2025 | The publication provides the foundational knowledge and skills necessary for recognising and mitigating the effect of wind on lifting operations. Created with modern, modular construction methods in mind, it takes account the latest technology in remote control load rotation devices, along with any potential risks. It goes into extensive detail around the subject of wind, the effect it has on cranes and loads and provides a methodical approach in how to select the correct crane for the load and wind surface area. | Crane Interest Group, Other Crane-related Publications, Tower Crane Interest Group | crane-interest-group other-crane-related-publications tower-crane-interest-group special-interest-groups | ||||
| CPA T_CIG 2507 Planning Control of Lifting Operations in Wind V1 July 2025 | The publication provides the foundational knowledge and skills necessary for recognising and mitigating the effect of wind on lifting operations. Created with modern, modular construction methods in mind, it takes account the latest technology in remote control load rotation devices, along with any potential risks. It goes into extensive detail around the subject of wind, the effect it has on cranes and loads and provides a methodical approach in how to select the correct crane for the load and wind surface area. | Crane Interest Group, Other Crane Interest Group Information, Tower Crane Interest Group | crane-interest-group other-crane-interest-group-information tower-crane-interest-group special-interest-groups | ||||
| Guidance for Safe and Correct Rigging of Mobile and Crawler Cranes | This publication provides good practice guidance on the safe and correct rigging of cranes to ensure that once cranes (mobile and crawler) are rigged or assembled, that sufficient checks are made to ensure that they are safe before being put into service. This pre-lift check process will help appointed persons and users in ensuring that the crane is rigged in accordance with the lift plan as well as the manufacturer’s instructions, and should mitigate any errors made during the rigging process. | Crane Interest Group, Mobile and Crawler Crane Guidance, Other Crane-related Publications | crane-interest-group mobile-and-crawler-crane-guidance other-crane-related-publications special-interest-groups | ||||
| NPCC Abnormal Load Guidance 2025 | Abnormal Loads, Mobile and Crawler Crane Guidance | abnormal-loads mobile-and-crawler-crane-guidance crane-interest-group special-interest-groups | |||||
| Download Mobile Crane Daily-Weekly Checks Template | CPA Mobile Crane (Wheeled) and Mobile Crane (Crawler) – Operator Checks – Daily and Weekly Record These pads of operator daily and weekly checks forms are produced by the CPA as an aid to crane owners and users in achieving the minimum requirements for compliance with the Provision and Use of Work Equipment Regulations 1998 (PUWER) and the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER). They are in printed in a carbon-copy format comprising of 50 pages, with separate pads available for either wheeled cranes or crawler cranes. | Crane Interest Group, Mobile and Crawler Crane Guidance, Other Crane-related Publications | crane-interest-group mobile-and-crawler-crane-guidance other-crane-related-publications special-interest-groups | ||||
| Download Crawler Crane Daily-Weekly Checks Template | CPA Mobile Crane (Wheeled) and Mobile Crane (Crawler) – Operator Checks – Daily and Weekly Record These pads of operator daily and weekly checks forms are produced by the CPA as an aid to crane owners and users in achieving the minimum requirements for compliance with the Provision and Use of Work Equipment Regulations 1998 (PUWER) and the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER). They are in printed in a carbon-copy format comprising of 50 pages, with separate pads available for either wheeled cranes or crawler cranes. | Crane Interest Group, Mobile and Crawler Crane Guidance, Other Crane-related Publications | crane-interest-group mobile-and-crawler-crane-guidance other-crane-related-publications special-interest-groups | ||||
| CPA Letter – European Directive 2007/38/EC – Fitting of Blind Spot Mirrors on Mobile Cranes | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Crane Interest Group Information | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-crane-interest-group-information special-interest-groups | |||||
| HSE Letter Crane Hire and Contract Lift | Crane Interest Group, Health and Safety, Other Crane Interest Group Information | crane-interest-group health-and-safety other-crane-interest-group-information special-interest-groups | |||||
| CIG Escorting Abnormal Loads Letter | Abnormal Loads, Crane Interest Group, Mobile and Crawler Crane Guidance | abnormal-loads crane-interest-group mobile-and-crawler-crane-guidance special-interest-groups | |||||
| Association of Chief Police Officers in Scotland (ACPOS) – Notice to Hauliers | Abnormal Loads, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | abnormal-loads crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | |||||
| Operational Guidance for Abnormal Load Escorting | To be read alonside code of practice self-escorting of abnormal loads and abnormal vehicles | Abnormal Loads, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | abnormal-loads crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| Highway Agency – Code of Practice Self-escorting of Abnormal Loads and Abnormal Vehicles | Abnormal Loads, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | abnormal-loads crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | |||||
| STGO Existing Regulations | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Special Types General Order (STGO) | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-types-general-order-stgo special-interest-groups | |||||
| STGO Plate Form | Crane Interest Group, Mobile and Crawler Crane Guidance, Special Types General Order (STGO) | crane-interest-group mobile-and-crawler-crane-guidance special-types-general-order-stgo special-interest-groups | |||||
| The Road Vehicles (Authorisation of Special Types) General Order | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Special Types General Order (STGO) | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-types-general-order-stgo special-interest-groups | |||||
| STGO Update | Crane Interest Group, Mobile and Crawler Crane Guidance, Special Types General Order (STGO) | crane-interest-group mobile-and-crawler-crane-guidance special-types-general-order-stgo special-interest-groups | |||||
| TIN 053 | Lifting of Loads with Integral Lift Points | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| TIN 052 | Lifting of Intermediate Bulk Containers (IBCs) | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| TIN 049 | Lifting of Pre-slung Loads | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| TIN 032 | Exclusion Zones | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| TIN 028 | Lifting of Mechanical Plant on Drip Trays | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| TIN 026 | Lifting Loads using Fabric Bag | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| TIN 022 | The Use of Tag Lines with Tower Cranes | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| TIN 017 | Radio Communication for Lifting Operations | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| TIN 004 | Installing Wire Ropes on Winch Drums and Storage Reels | Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance, Other Relevant TINs | crane-interest-group health-and-safety mobile-and-crawler-crane-guidance other-relevant-tins special-interest-groups | ||||
| CIG TIN 109 | Safe Lifting of Hot Tubs | CIG Technical Information Notes, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CIG TIN 108 | Red Diesel (Gas Oil) Fuel Specifications for Mobile Cranes | CIG Technical Information Notes, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CIG TIN 107 | “Hybrid” Lifting Operations with Mobile Cranes | CIG Technical Information Notes, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CIG TIN 106 | Plating and Testing of Mobile Cranes Mounted on an HGV Chassis | CIG Technical Information Notes, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CIG TIN 105 | Notification Requirements for Mobile Cranes and Engineering Plant | CIG Technical Information Notes, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CIG TIN 104 | Requirements for In-service Performance Testing of the Chassis Brakes of Mobile Cranes Operating Under STGO | CIG Technical Information Notes, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CIG TIN 103 | Responsibilities During Contract Lifting | CIG Technical Information Notes, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CIG TIN 102 | Four Yearly Overload Testing of Mobile Cranes | CIG Technical Information Notes, Crane Interest Group, Health and Safety, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group health-and-safety mobile-and-crawler-crane-guidance special-interest-groups | ||||
| CIG TIN 101 | The Effect of Wind on Mobile Cranes In-service | CIG Technical Information Notes, Crane Interest Group, Mobile and Crawler Crane Guidance | cig-technical-information-notes crane-interest-group mobile-and-crawler-crane-guidance special-interest-groups | ||||
| ESTA Guidance on Transporting and Installation of Onshore Wind Turbines | The European Association of Abnormal Loads Transport and Mobile Cranes (ESTA) has published a new best practice guide in an attempt to cut onshore wind farm accidents and the guidance establishes minimum requirements for transport and lifting operations of wind turbine installations by collecting existing and relevant industry guidance. The publication includes aspects of transport and lifting operations such as planning, inspection, maintenance and competency of personnel in order to minimise associated risks and aiming to improving health and safety relating to transport and lifting operations during the construction of Wind Turbine Generators (WTG) plants. | Crane Interest Group, Health and Safety | crane-interest-group health-and-safety special-interest-groups | ||||
| CPA/ALLMI – The Management of Lifting Operations with Lorry Loaders | This guidance has been prepared by the industry in conjunction with ALLMI and the HSE to provide clarity about the safe use of lorry loaders: including planning, role of personnel, training and familiarisation of personnel, siting, safe use, maintenance, inspection and thorough examination. | Crane Interest Group, Health and Safety | crane-interest-group health-and-safety special-interest-groups | ||||
| CIG 9801(5) – Crane Hire and Contract Lifting | This guidance helps to establish before a contract is drawn up whether the customer or the crane hire company will provide the “appointed person”. It explains the differences between “crane hire” and “contract lifting” and the insurance needs in each set of circumstances. | Crane Interest Group, Health and Safety | crane-interest-group health-and-safety special-interest-groups | ||||
| CIG 0201 – Risk Assessment and Method Statement for a Contract Lift | This publication provides guidance for the Appointed Person on completing a lift plan for a contract lift. The publication is divided into four parts and contains guidance for safe planning and three template forms that can be completed by the AP which indicates the factors that need to be taken into account during the planning process. The forms include a sample risk assessment and method statement, a sample site plan form that shows the positioning of the crane and loads, and a sample form showing the crane access and capacity record for a crane hire. This document is in support of the publication CIG 9801(5). | Crane Interest Group, Health and Safety | crane-interest-group health-and-safety special-interest-groups | ||||
| CIG 0701 – Working at Height on Mobile Cranes | Where working at height is required as part of the rigging, use, maintenance and thorough examination of mobile cranes, it should be carried out following careful planning, including adequate assessment of the risks involved. The publication, updated in July 2022, provides comprehensive guidance on working at height and resultant issues | Crane Interest Group, Health and Safety | crane-interest-group health-and-safety special-interest-groups | ||||
| CIG 1901 V2 – Guide to Maintaining Roadworthiness of Mobile Cranes | This guide provides good practice advice on the duties and responsibilities that a crane owner or driver have to the roadworthiness of their vehicles. It covers what they are legally required to do, what is good practice and gives information on where to seek additional help, including technical assistance or training. This publication was updated in February 2022 to include all mobile crane types. | Crane Interest Group, Health and Safety | crane-interest-group health-and-safety special-interest-groups | ||||
| CIG 1001 – Maintenance, Inspection and Thorough Examination of Mobile Cranes | This guidance provides clarity about the practical elements of maintenance, inspection and thorough examination and represents best practice for mobile cranes used both in the construction and across all industry sectors. The guidance has been updated with inclusions of heavy lift cranes; chassis inspections of road-going cranes; identification and recording of safety critical components; thorough examination requirements after rigging on site; defined scopes of periodic thorough examination; thorough examination following installation and further includes ground assessment requirements, medical fitness and protection against fumes. | Crane Interest Group, Health and Safety | crane-interest-group health-and-safety special-interest-groups | ||||
| CIG 2308 – Tendering, Management and Operations of Mobile Cranes | This document focusses on the minimum standards required for the tendering, management and operations of mobile cranes and provides a range of good practice advice on the expected standard of duties and the relevant responsibilities for both operators and crane users. The guide covers the legal requirements and directs readers to further relevant guidance material. This guide aims to raise standards and encourage sourcing from responsible mobile crane suppliers. | Crane Interest Group, Health and Safety | crane-interest-group health-and-safety special-interest-groups |